Alphaland Tower

The Alphaland Tower, designed by Wong & Ouyang, will be the most prestigious business address in the country. It is the newest of only six premium-grade office buildings in the Makati central business district.

The 34-storey Alphaland Tower has a gross floor area of 48,000 square meters. It features state-of-the-art conference centers, meeting rooms, dining facilities, and security systems. The street entrance leads to a grand lobby, with a 10-meter high ceiling. The lobby is entirely clad in glass to admit natural light. The ground and second levels are offered as prime commercial space with a three-storey penthouse available as a single lease, which has its own rooftop gardens and lounge areas. Each level has a floor template between 1,100 and 1,600 square meters. Alphaland Tower has a five-level basement with 480 parking slots to accommodate its tenants and guests.

The Alphaland Tower features environmentally sustainable technologies and has earned a pre-certified GOLD rating (Core and Shell) with the United States Green Building Council (USGBC) Leadership in Energy and Environmental Design (LEED) Green Building Rating System. The building’s design and features optimize energy performance and improve indoor air quality, which in turn improves the health, comfort, and productivity of its occupants. The use of efficient plumbing design and fixtures results in a significant decrease in water consumption.

The Alphaland Tower project is overseen by an outstanding team of builders and designers, in addition to the conceptual architects Wong & Ouyang, including architects of record Rchitect’s, Inc., structural engineers SY2 (Formerly Aromin & Sy), plumbing, sanitary, and fire protection engineers NBF Consulting Engineers, mechanical engineers LR Punzalan and Associates, electrical engineers RA Mojica and Partners, project construction managers RM Cabanela Construction Management Co., and environmental sustainability and commissioning authorities Ecosolutions, Inc.

The structure was topped off in July 2012. Water-tightness and complete curtain wall installation was completed by October 2012. The project is substantially completed and building energization is scheduled by February 2013.

Visit the Alphaland Tower website >